It is a building of approximately 2700 m2 located in front of Hangars 3 and 4 above the main machinery sector, who will be the provider of fluids such as water and steam and electricity. The height of the premises is 5.40mts. Having a service mezzanine, which will be housed in a small snack for personal.The project consists of a concrete and masonry building with large glazed areas. An area of existing process tanks will be re positioned . Access will be restricted by magnetic controls, while staff not affected to the area will circulate in a near corridor.